The demolition of the Beijing wall in cutting, construction often meet the construction team, professional for a whole cut, which does not affect the load-bearing wall, but not on the wall formation damage. Today, small make up for you static open wall construction technology process and construction attention, the question of a detailed understanding of. Method and construction features of wall cutting and removing
A hydraulic clamp, remove:
Professional building removal project, broken hydraulic pliers, safety after use, low cost, can effectively decrease the construction noise, high efficiency, and decrease dust pollution, product performance in the domestic first-class level. Widely used in static crushing slabs, concrete beam, concrete wall, concrete column cornice, bridge, protective removal removal projects such as stairs
Features: (1 genera, 2, inward force crack method; reinforced concrete structure can be broken, the thickness of 650MM without cooling water; (3, with static crushing, no vibration, to ensure construction safety; no dust, no noise, broken blocks easy removal, professional service, worthy of trust.
2: professional removal of various indoor indoor removal on the wall, smashing tiles. Hit the wall, shovel, home decoration, renovation, demolition walls, doors and windows open, open the radiator pipeline removed;
3: the removal of high chimney removed the billboards removed the upper box removed. High altitude removal is the construction of the project a great risk of. In the air removal construction, should be the most attention is the security question. We in the air removal operation for many years, in a safe, efficient won praise owners together. We always adhere to the project in high altitude removal: safety first, strict management principles. Safety equipment does not reach the designated position, the wind does not work, rain does not work to ensure the safety of the construction of the construction.
Two, the removal of static technical processes: positioning, line, drilling hole (lifting hole), hanging, pre cut, mixed clot lifting, everything necessary to open out block after lifting hole pre lifting temporary fixation, avoid incision block suddenly collapsed, and complete the region, it is necessary to set up safety protection equipment make safety warning symbols, avoid falling objects or people. All areas comply with the withdrawal from top to bottom, from left to right order construction.
1, positioning line: selection of measuring instruments, intended to block the incision site location selection, fountain bomb line, that block open range, to ensure the accuracy of azimuth cut block.
2, drilling hole (lifting hole).
3, pre hanging
4, open: the diameter of 63mm diamond block cut. 5, concrete blocks, lifting away: straight wall and remove some of the original incision respectively, the hole is not satisfy the request at repair or removal, will remove some of the waste timely removal. Because the concrete wall weight larger for easy removal, so cut down the concrete block scale is not too big, that single piece of concrete wall scale is 750mm * 550mm * 350mm, 361kg component.